Moisture mitigation tenant improvements, without the schedule hit

Moisture mitigation tenant improvements keep build-outs on schedule. We work with general contractors across Colorado, because slab vapor is the failure that shows up after the flooring is already down. If slab moisture threatens your flooring or coating install in the Denver metro or near Denver International Airport, our moisture mitigation systems help protect the spec and the timeline.

Why GCs call us

What moisture mitigation tenant improvements include

Where moisture mitigation tenant improvements help most

Coordination that saves time

  1. We align on testing and target perm ratings with your flooring vendor.
  2. We set the surface profile with shot blasting or grinding.
  3. We complete mitigation and hand off a clean, ready-for-next-trade surface.

We do not pour structural concrete or new slabs. If a slab needs leveling before finishes, we grind down high spots and install self-leveling underlayment to the existing slab so floor coverings sit flat.

If your project is near the I-25 corridor, the I-70 freight corridor, or the E-470 distribution parks, we can mobilize quickly and phase areas so electricians, painters, and flooring crews stay on track. Request a free estimate at allwestsurfaceprep.com or call our team to review your TI schedule.

Test first, because the number sets the system

Two standards govern the testing. ASTM F2170 measures relative humidity with probes set into the slab, and it is the method most manufacturers now require. ASTM F1869 measures surface emission with calcium chloride, so it reads the top of the slab rather than the depth.

Most adhesive and coating manufacturers cap acceptance somewhere between 75 and 85 percent relative humidity. Until you have that number, nobody can specify a mitigation system honestly, since the required perm rating follows the reading.

Why vapor drive breaks tenant improvement schedules

A tenant improvement runs on a fixed handover date. If the flooring vendor arrives, tests the slab, and finds the reading out of range, the schedule stops while somebody sources a mitigation system and waits for cure.

That is the expensive version. The cheap version tests during demolition, so mitigation gets priced and scheduled alongside the surface prep instead of after it.

How the work sequences

We open the surface with shot blasting or dustless grinding to the profile the mitigation manufacturer specifies. After the profile is verified, we install the system and let it cure to the data sheet, then hand off a surface the next trade can bond to.

Where a slab also sits out of tolerance, we correct flatness in the same mobilization rather than bringing a crew back.