CONCRETE JOINT FILLING

Industrial Concrete Joint Filling

Concrete joint filling: Unfilled joints let hard-wheel traffic chip the edges away. Filling supports the joint edge so the slab stops breaking down at its weakest line.

Since 1990
Commercial and industrial only
1,000 – 160,000 SF
Project range
10 to 15
Trained crew members
Same-day answer
24 to 48 hour mobilization, Front Range
WHAT IT SOLVES

Concrete joint filling — where a warehouse slab actually fails

Spalling joint edges

Forklift wheels hit an unsupported joint edge thousands of times a day. Without filler to carry that load the concrete chips away and the gap widens.

Debris and hygiene

Open joints collect dirt, water and product. In food and pharmaceutical environments that is a compliance problem as much as a housekeeping one.

Rough ride and equipment wear

Every open joint is an impact for the forklift and its load. Filled joints give a smoother run, which shows up in equipment maintenance over time.

JOINT TYPES

Concrete joint filling — control joints and expansion joints are not the same

Treating them the same is a common and expensive mistake. They do different jobs in the slab and take different materials.

Control and saw-cut joints

These are cut to control where the slab cracks as it cures. Once the slab has done most of its shrinking they take a semi-rigid filler that supports the edge under wheel traffic.

Expansion joints

These are designed to move. They need a flexible material that can accommodate that movement, not a rigid filler that will simply tear or push out.

HOW A PROJECT RUNS

How a concrete joint filling project runs

01

Site assessment

We walk the slab, check its condition, test for moisture where it matters, and give you a clear scope with no vague line items.

02

Clean and prepare

Joints are cut clean and cleared of old filler, debris and contamination so the new material bonds to sound concrete on both faces.

03

Repair and fill

Spalled edges are repaired where needed, then the correct material for that joint type is installed full depth.

04

Shave flush

Filler is shaved flush with the slab so the joint carries wheel loads across its full width.

WHERE WE DO THIS WORK

Where we provide concrete joint filling

All West Surface Prep is based in Commerce City, Colorado and works across Colorado, Wyoming, Utah, Arizona, New Mexico and South Dakota. For Denver metro projects specifically, see our concrete joint filling in Denver page.

We work out of Commerce City. For Denver facility types, site access and scheduling, see concrete joint filling in Denver.

Common questions about concrete joint filling

Why do our joint edges keep chipping?

Almost always because the joints are unfilled or filled with the wrong material. Nothing supports the edge, so hard wheels break the concrete away.

Can you repair joints that are already damaged?

Yes. Spalled edges are rebuilt before filling, otherwise the new filler has nothing sound to bond to.

Can this be done while we operate?

Usually yes. Joint work is phased aisle by aisle so the facility keeps running around it.

Is one filler right for every joint?

No. Control joints take a semi-rigid filler that supports the edge. Expansion joints move and need a flexible material instead.

Get a concrete joint filling quote

Send the facility type, the approximate linear footage of joint, and whether edges are already spalling. You will hear back the same business day.

For specification guidance on joint design and filling, see the American Concrete Institute.