EPOXY FLOOR COATINGS

Epoxy Floor Coatings for Heavy-Use Facilities

In practice, epoxy floor coatings: Monolithic epoxy and urethane systems for buildings that take real abuse. Typically, chemical resistance, forklift traffic and washdown, in one seamless floor. If you need the space back the same day, see polyaspartic coatings.

Since 1990
Commercial and industrial only
1,000 – 160,000 SF
Project range
UltraFlor
10-year warranty available
Next-day response
On most projects
WHAT IT SOLVES

Epoxy floor coatings — built for what actually breaks a coating

Chemical exposure and washdown

As a result, food production, commercial kitchens and medical spaces need a seamless surface that survives cleaning chemicals and constant moisture. In short, a monolithic coating leaves no seams for contamination to sit in.

Forklift and hard-wheel traffic

Generally, warehouse and manufacturing floors take point loads and turning forklifts every day. Because of that, the system is specified around the traffic the floor actually sees, not just the look.

Peeling and yellowing

In most cases, a commercial coating fails on peeling or yellowing long before it fails on appearance. In addition, correct preparation and the right resin for the exposure are what prevent that.

CHOOSING A SYSTEM

Epoxy floor coatings — epoxy or urethane depends on the exposure

They are not interchangeable. For example, the right resin depends on what the floor actually sees day to day, and many facilities need both in different areas of the same building.

Where epoxy fits

However, epoxy gives chemical resistance and a hard, seamless surface. In other words, it suits warehouses, manufacturing and commercial buildings where chemical exposure and abrasion are the main concerns.

Where urethane fits

Of course, urethane handles thermal shock and heavy washdown better, which is why it goes into food and beverage areas where hot water and steam hit the floor directly.

HOW A PROJECT RUNS

How a epoxy floor coatings project runs

01

Site assessment

In practice, we walk the slab, check its condition, test for moisture where it matters, and give you a clear scope with no vague line items.

02

Surface preparation

The slab is ground or shot blasted to the ICRI CSP profile the coating system requires, so the coating bonds instead of peeling.

03

System install

Typically, the specified epoxy or urethane system goes down in coats, phased around your operation where the building has to stay open.

04

Return to service

Many systems cure in a single day, so the facility is back in service before the next shift.

Common questions about epoxy floor coatings

How long before we can use the floor?

Generally, many systems cure in a single day and take traffic before the next shift. Because of that, the exact schedule depends on the system specified and the conditions in the building.

Do you test for moisture first?

Yes. Elevated moisture vapour causes most coating failures, so we test the slab before anything goes down rather than coating over the cause.

Can you coat a floor that has failed before?

Yes. In most cases, the failed coating comes off, we establish why it failed, and the replacement system is specified around that rather than repeating the mistake.

Is epoxy suitable for food production?

In addition, seamless chemical-resistant systems are used in food service and medical facilities. For example, where thermal shock and washdown are involved, urethane is usually the better resin.

Get a epoxy floor coatings quote

However, send the facility type, the approximate square footage and what the floor is exposed to. In other words, you will hear back the same business day.

For specification guidance on epoxy and urethane coating systems, see the American Concrete Institute.