Fast-Cure Polyaspartic Floor Coatings
What you specify when the floor has to go back into service fast. Most systems install in a single day and take foot traffic the next morning.
For spaces that cannot be closed for a week
Downtime you cannot afford
An epoxy build can hold a space for the better part of a week. A polyaspartic system typically installs in a single day, so the room comes back the next morning.
UV exposure and yellowing
Polyaspartic is UV stable, so it holds its colour in areas that see daylight, where some coating systems amber over time.
Schedules that will not wait
The cure is fast, which matters when the programme has no slack and the space has to be released on a fixed date.
Polyaspartic or epoxy
They solve different constraints. The question is usually how long the space can be out of service, and what the floor is actually exposed to.
Choose polyaspartic when
The space cannot be down for long, the floor sees daylight, or the schedule will not tolerate a multi-day build.
Choose epoxy when
The priority is chemical resistance and film build rather than turnaround, and the area can stay closed while the system cures.
Four steps, start to handoff
Site assessment
We walk the slab, check its condition, test for moisture where it matters, and give you a clear scope with no vague line items.
Surface preparation
The slab is ground or blasted to the required profile. A fast cure does not remove the need for proper preparation.
Single-day install
Coats go down in sequence through the day, phased so the space is released as planned.
Next-morning traffic
Most systems take foot traffic the following morning, with heavier traffic timing depending on the system specified.
Colorado headquarters, six-state coverage
All West Surface Prep is based in Commerce City, Colorado and works across Colorado, Wyoming, Utah, Arizona, New Mexico and South Dakota. For Denver metro projects specifically, see our polyaspartic coating in Denver page.
Colorado60 cities
New Mexico7 cities
South Dakota6 cities
Common questions about polyaspartic coatings
How fast can we use the floor?
Most systems install in a single day and take foot traffic the next morning. Timing for heavier traffic depends on the system specified.
Is polyaspartic better than epoxy?
Neither is better outright. Polyaspartic wins on turnaround and UV stability. Epoxy wins on film build and chemical resistance.
Does it still need full preparation?
Yes. A fast cure does not change the bond requirement. The slab is ground or blasted to profile before anything goes down.
Will it yellow in daylight?
Polyaspartic is UV stable, which is exactly why it gets specified in areas that see natural light.
Tell us your downtime window
Send the facility type, the approximate square footage and how long the space can be out of service. You will hear back the same business day.